This project was carried out for the immediate supply of drinking water to Bushehr and Borazjan cities, during which 0.12 cubic meters per second of treated water will be transferred through Shahpour river. In this project, water is transferred to a treatment plant through a reservoir and the treated water reaches the Borazjan service tank by a high-pressure pump and pipeline. This water is then transferred from Borazjan by pipeline to Bushehr and the air base by designing and implementing pressure breakers.