Preliminary studies, design and supervision of construction and implementation of this project with a capacity of 9.4 cubic meters per second, including a reservoir on the Karun River, 90 km transmission line (GRP pipe with a diameter of 1800 to 1950 mm and a canal with a flow rate of 5.11 cubic meters per second). ), 2 pumping stations (Mansouri 1 and Mansouri 2), 3 treatment plants with capacities of 3, 5.4 and 4 cubic meters per second and water storage sources.