Project Description :
The project with a capacity of 05/1 cubic meters per second includes 10 deep wells and wells, 9 km of water collection pipeline (300 to 800 mm asbestos cement pipe and ductile iron), 14000 cubic meters concrete storage tank, pumping station including 8 The electric pump (132 and 45 kW) is about 65 km of transmission pipeline (asbestos cement 250 to 600 mm).