The project with a capacity of 32.1 cubic meters per second includes 8 wells and related well construction, about 6 km of water collection pipeline (asbestos cement pipe 400 to 700 mm), about 80 km of water transmission pipeline (steel pipe 1200 mm), The concrete storage tank has a volume of 12,000 cubic meters and a pumping station.