The purpose of this project is to supply drinking water to the city of Shiraz based on the need in the horizon of 1405. More than this study and its design was done by the engineers of Tehran Boston.
After conducting studies and designing the plan to complete the drinking water transmission line in Shiraz, another contract was signed, during which Tehran Boston engineers supervised the construction of pipelines, tunnels, treatment plants and additional pumping stations for supplying drinking water in Shiraz. This supervision includes workshop and excellent supervision.