In order to compensate for the lack of water pressure to fill the Fajr reservoir and also to transfer more water to supply the water needed by the petrochemical industries located in the Special Economic Zone, the Petrochemical Special Economic Zone Organization plans to increase the water transfer capacity from the 40-inch line west of the Special Economic Zone to Consulting engineers were notified. Executive operations include:
- Execution of mechanical and electrical operations of the new pump house located in the old treatment plant of Sarbandar, including installation and commissioning of 8 electric pumps of 5/250 ATA (1 + 3) and (3 + 1) KW315
- Installation of three 1250 KVA transformers (2 + 1) and switchboards
- Execution of construction operations of a pump house, electricity substation and control room located in the old Sarbandar refinery
- Execution of telemetry equipment to control the output flow from the pumps, the pressure of each electric pump and the output pressure from the pump house, control of the water level of the tank and installation of Energy Meter to control the amps and voltage