Project Description :
Preliminary studies, design and supervision of construction and implementation of this project include a catchment tower on the lake of Dorodzan Dam, 100 km transmission line (steel pipe with a diameter of 42 and 56 inches), 3 pumping stations, a treatment plant and several concrete water storage tanks with full capacity 80,000 cubic meters. Extraction rate from the lake is 7.2 cubic meters per second, of which 9.0 cubic meters per second (without refining) is allocated to Shiraz Petrochemical Plant and the remaining 8.1 cubic meters per second is refined and transferred to Shiraz. Finds.