This project is a combination of two projects to transfer drinking water to the northeastern cities of Khuzestan province and to transfer agricultural water from the central and northern Izeh region to Baghmalek. The water supply reservoir of Karun 3 reservoir and the total volume of flow is 1.11 cubic meters per second. The volume of agricultural consumption is 8 and the volume of drinking consumption is 1/3 cubic meter per second.
The main components of this plan are: Reservoir tunnel with a length of 880 meters and a diameter of 3 meters, a bridge with a span of 10 meters and a length of 120 meters, a pump house with a capacity of 11.1 cubic meters per second and a pumping height of 225 meters, a short tunnel with a diameter of 3 meters and a length of 420 meters. And a finished diameter of 7.3 meters, a refinery with a capacity of 1.3 cubic meters per second, a tunnel with a diameter of 5.10 and a length of 320 meters and transmission lines with a diameter of 800 to 2000 mm with a length of nearly 140 km.